|
All equipment for which a permit is obtained under this Code shall be
inspected by the Building Official. No portion of any equipment intended
to be concealed by any permanent portion of the building shall be concealed
until inspected and approved. When the installation of any equipment is
complete, a second or final inspection shall be made. Equipment regulated
by this Code shall not be connected to the fuel or power supply until authorized
by the Building Official.
EXCEPTION: The requirements of this Section shall not be considered to
prohibit the operation of any heating equipment installed to replace existing
heating equipment serving an occupied portion of a building, in the event a
request for inspection of such heating equipment has been filed with the
Department not more than 48 hours after such replacement work is completed, and
before any portion of such equipment is concealed by any permanent portion of
the building. A final inspection approval may, upon notice, be revoked by
the Building Official if he finds that the heating, ventilating, comfort
cooling, or refrigeration equipment fails in any respect to comply with the
requirements of this Code, or that the installation is unsafe, dangerous, or a
hazard to life or property.
|
| |