Any electrical equipment, product or material used or intended to be used
under the scope this Title must be approved under ORS 479. To be accepted
by the Bureau, such equipment, product or material shall be installed,
constructed, altered, renovated, repaired and maintained in compliance with the
requirements of this Title.
Nothing in this Title is intended to permit the design, construction,
installation, quality of materials, location, operation and maintenance of
equipment which is not in accordance with any applicable sections of Title 24
(Building Regulations), Title 25 (Plumbing Regulations), and Title 27 (Heating
and Ventilating Regulations), Title 28 (Floating Structures) and Title 32 (Signs
and Awnings) of the Code of the City of Portland.
Any portion of any installation, construction, alteration, renovation, or
repair made in violation of this Title shall be removed or corrected to comply
with the requirements of this Title.Whenever there is insufficient evidence
of compliance with any of the requirements of this Title or evidence that any
equipment, product, material or construction does not conform to the
requirements of this Title, the Director may require tests as proof of
compliance. All tests shall be made by an agency approved by the State of
Oregon . The tests shall be
made at no expense to the City. Test methods shall be as specified by the
Electrical Code or by other recognized test standards. If there are no
recognized and accepted test methods for the proposed equipment, product,
material, or construction, the Director shall determine test procedures.
Reports of such tests shall
|