Connecting electrical installations to an electrical
supply source shall be done only after approval by the Bureau. Such
inspection approval is identified by the City ofPortland Electrical
Inspection Record initialed by the Director and posted on
the panel box or other conspicuous place.
Exceptions: An electrical
installation under this Title may be legally energized prior to inspection
provided:
A. An emergency service tag, issued by the Bureau, is attached to the installation. These tags may only be issued to and used by Oregon licensed electrical
contractors. The electrical contractor shall request an inspection prior
to or immediately after attaching the tag to the installation. When signed
by the contractor or authorized representative and bearing a number issued by
the Bureau, the tag will authorize the electrical utility to make connections
pending final approval by the Director; or,
B. The electrical
contractor is performing minor electrical work utilizing a valid minor
installation label or when the installation is under an Electrical Master Permit
(Industrial Plant) Program.